Titus Sienta Solar (26INR0230)

Titus Sienta Solar is a 501.9 MW solar interconnection project in Pecos, Texas with a current status of suspended.

501.9 MWCapacity
SuspendedStatus
PecosMarket
SolarTechnology

Project facts

Canonical nameTitus Sienta Solar
Queue ID26INR0230
Statussuspended
Source status—
MarketPecos
TechnologySolar
Capacity501.9 MW
StateTexas
CountyPecos
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developerSol Sienta Solar, LLC—low
2026-09-30poi_nameTap 138kV 1239 Coyanosa - 11238 Blair Lake Sub —low
2026-09-30phaseSS Completed, FIS Completed, No IA—low
2026-09-30operational_date2028-06-01—medium
2026-09-30statusoperationalsuspendedhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.