TMI - Juniata 500kV (G32)

TMI - Juniata 500kV is a 675.0 MW gas interconnection project in York, Pennsylvania with a current status of withdrawn.

675.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameTMI - Juniata 500kV
Queue IDG32
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity675.0 MW
StatePennsylvania
CountyYork
Point of interconnection—
Requested (queue) date2001-05-31
Proposed in-service date2005-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerME

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata