TN Queue Project 323 — Other in Marion, Tennessee
TN Queue Project 323 — Other in Marion, Tennessee is a 27.0 MW other interconnection project in Marion, Tennessee with a current status of active. It is proposed to connect at Raccoon Mountain 161-kV Substation.
27.0 MWCapacity
ActiveStatus
TNMarket
OtherTechnology
Project facts
| Canonical name | TN Queue Project 323 — Other in Marion, Tennessee |
|---|---|
| Queue ID | 323 |
| Status | active |
| Source status | Facilities Study |
| Market | TN |
| Technology | Other |
| Capacity | 27.0 MW |
| State | Tennessee |
| County | Marion |
| Point of interconnection | Raccoon Mountain 161-kV Substation |
| Requested (queue) date | 2017-08-04 |
| Proposed in-service date | 2022-01-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-17
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata