TN Queue Project 333 — Solar+Battery in Shelby, Tennessee
TN Queue Project 333 — Solar+Battery in Shelby, Tennessee is a 74.0 MW solar+battery interconnection project in Shelby, Tennessee with a current status of active. It is proposed to connect at Shelby-SR Millington 161-kV TL.
74.0 MWCapacity
ActiveStatus
TNMarket
Solar+BatteryTechnology
Project facts
| Canonical name | TN Queue Project 333 — Solar+Battery in Shelby, Tennessee |
|---|---|
| Queue ID | 333 |
| Status | active |
| Source status | Sync |
| Market | TN |
| Technology | Solar+Battery |
| Capacity | 74.0 MW |
| State | Tennessee |
| County | Shelby |
| Point of interconnection | Shelby-SR Millington 161-kV TL |
| Requested (queue) date | 2017-10-18 |
| Proposed in-service date | 2024-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.