TN Queue Project 482 — Solar in Cumberland, Tennessee

TN Queue Project 482 — Solar in Cumberland, Tennessee is a 110.0 MW solar interconnection project in Cumberland, Tennessee with a current status of active. It is proposed to connect at Plateau 500-kV Substation (161-kV Interconnection).

110.0 MWCapacity
ActiveStatus
TNMarket
SolarTechnology

Project facts

Canonical nameTN Queue Project 482 — Solar in Cumberland, Tennessee
Queue ID482
Statusactive
Source statusFacilities Study
MarketTN
TechnologySolar
Capacity110.0 MW
StateTennessee
CountyCumberland
Point of interconnectionPlateau 500-kV Substation (161-kV Interconnection)
Requested (queue) date2021-10-05
Proposed in-service date2027-09-13
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata