TN Queue Project 483 — Gas in Stewart, Tennessee

TN Queue Project 483 — Gas in Stewart, Tennessee is a 1,513.0 MW gas interconnection project in Stewart, Tennessee with a current status of active. It is proposed to connect at Cumberland 500-kV Switchyard.

1,513.0 MWCapacity
ActiveStatus
TNMarket
GasTechnology

Project facts

Canonical nameTN Queue Project 483 — Gas in Stewart, Tennessee
Queue ID483
Statusactive
Source statusCOD
MarketTN
TechnologyGas
Capacity1,513.0 MW
StateTennessee
CountyStewart
Point of interconnectionCumberland 500-kV Switchyard
Requested (queue) date2021-10-08
Proposed in-service date2025-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-24phaseFacilities StudyCODlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata