TN Queue Project 588 — Gas in Shelby, Tennessee is a 198.0 MW gas interconnection project in Shelby, Tennessee with a current status of active. It is proposed to connect at Allen 161-kV substation.
198.0 MWCapacity
ActiveStatus
TNMarket
GasTechnology
Project facts
| Canonical name | TN Queue Project 588 — Gas in Shelby, Tennessee |
|---|---|
| Queue ID | 588 |
| Status | active |
| Source status | Facilities Study |
| Market | TN |
| Technology | Gas |
| Capacity | 198.0 MW |
| State | Tennessee |
| County | Shelby |
| Point of interconnection | Allen 161-kV substation |
| Requested (queue) date | 2023-11-03 |
| Proposed in-service date | 2024-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-24 | poi_name | L5396, Str 8 - Allen CCP | Allen 161-kV substation | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata