tn (018689)
tn is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of active. It is proposed to connect at Hayfield Substation.
74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | tn |
|---|---|
| Queue ID | 018689 |
| Status | active |
| Source status | in g |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Gilchrist |
| Point of interconnection | Hayfield Substation |
| Requested (queue) date | 2016-12-21 |
| Proposed in-service date | 2021-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | tn |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata