tn (018689)

tn is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of active. It is proposed to connect at Hayfield Substation.

74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nametn
Queue ID018689
Statusactive
Source statusin g
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnectionHayfield Substation
Requested (queue) date2016-12-21
Proposed in-service date2021-06-01
Operational date
Withdrawn date
Developertn
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata