tn (074578)

tn is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of withdrawn. It is proposed to connect at Cowbell Switching Station.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nametn
Queue ID074578
Statuswithdrawn
Source statusWithdrawn 12/31/2022 mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnectionCowbell Switching Station
Requested (queue) date2020-04-21
Proposed in-service date
Operational date
Withdrawn date
Developertn
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.