tn (870423)

tn is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of suspended. It is proposed to connect at Hayfield Substation.

74.5 MWCapacity
SuspendedStatus
FLMarket
SolarTechnology

Project facts

Canonical nametn
Queue ID870423
Statussuspended
Source statusSuspended Con Pst rr ou gc rt ei so sn - In
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnectionHayfield Substation
Requested (queue) date2023-02-20
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developertn
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectsuspendedhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata