tn Flo Pr aid ra R ee rsn ,e Lw La Cble (018686)

tn Flo Pr aid ra R ee rsn ,e Lw La Cble is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of active. It is proposed to connect at Newberry Substation.

74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nametn Flo Pr aid ra R ee rsn ,e Lw La Cble
Queue ID018686
Statusactive
Source statusDm e c ia O re n 11/27/2024 c mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnectionNewberry Substation
Requested (queue) date2016-12-21
Proposed in-service date2024-04-02
Operational date
Withdrawn date
Developertn
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata