tn Flo Pr aid ra R ee rsn ,e Lw La Cble (018694)
tn Flo Pr aid ra R ee rsn ,e Lw La Cble is a 74.5 MW solar interconnection project in Hamilton, Florida with a current status of withdrawn. It is proposed to connect at Suwannee Springs Substation.
74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | tn Flo Pr aid ra R ee rsn ,e Lw La Cble |
|---|---|
| Queue ID | 018694 |
| Status | withdrawn |
| Source status | Withdrawn 12/31/2021 |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Hamilton |
| Point of interconnection | Suwannee Springs Substation |
| Requested (queue) date | 2016-12-21 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | tn |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata