TN Queue Project TC25-035 — Other in Hamilton, Tennessee
TN Queue Project TC25-035 — Other in Hamilton, Tennessee is a 24.0 MW other interconnection project in Hamilton, Tennessee with a current status of active. It is proposed to connect at Sequoyah Nuclear 500-kV Substation.
24.0 MWCapacity
ActiveStatus
TNMarket
OtherTechnology
Project facts
| Canonical name | TN Queue Project TC25-035 — Other in Hamilton, Tennessee |
|---|---|
| Queue ID | TC25-035 |
| Status | active |
| Source status | Cluster Study |
| Market | TN |
| Technology | Other |
| Capacity | 24.0 MW |
| State | Tennessee |
| County | Hamilton |
| Point of interconnection | Sequoyah Nuclear 500-kV Substation |
| Requested (queue) date | 2024-08-14 |
| Proposed in-service date | 2027-11-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-24 | poi_name | SQN 500kV Switchyard | Sequoyah Nuclear 500-kV Substation | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata