To199SB_2 (Q25-LG-6-11-1)

To199SB_2 is a 199.0 MW solar+battery interconnection project in El Paso County, Texas with a current status of active. It is proposed to connect at Tornillo 115 kV Substation.

199.0 MWCapacity
ActiveStatus
TXMarket
Solar+BatteryTechnology

Project facts

Canonical nameTo199SB_2
Queue IDQ25-LG-6-11-1
Statusactive
Source status
MarketTX
TechnologySolar+Battery
Capacity199.0 MW
StateTexas
CountyEl Paso County
Point of interconnectionTornillo 115 kV Substation
Requested (queue) date2025-06-11
Proposed in-service date2029-09-16
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata