TOCE GA 1 Solar (GI-177)

TOCE GA 1 Solar is a 125.0 MW solar interconnection project in Burke County, Georgia with a current status of active. It is proposed to connect at Greens Cut - Greens Cut Junction 115 kV Tap.

125.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameTOCE GA 1 Solar
Queue IDGI-177
Statusactive
Source statusSystem Impact Study
MarketGA
TechnologySolar
Capacity125.0 MW
StateGeorgia
CountyBurke County
Point of interconnectionGreens Cut - Greens Cut Junction 115 kV Tap
Requested (queue) date2023-08-03
Proposed in-service date2026-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata