TOCE GA Solar 4 (GI-189)
TOCE GA Solar 4 is a 325.0 MW solar+battery interconnection project in Jefferson County, Georgia with a current status of active. It is proposed to connect at Wadley – Waynesboro TL line tap.
325.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | TOCE GA Solar 4 |
|---|---|
| Queue ID | GI-189 |
| Status | active |
| Source status | Full NTP |
| Market | GA |
| Technology | Solar+Battery |
| Capacity | 325.0 MW |
| State | Georgia |
| County | Jefferson County |
| Point of interconnection | Wadley – Waynesboro TL line tap |
| Requested (queue) date | 2024-01-08 |
| Proposed in-service date | 2027-02-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Transmission |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata