Todhunter 69kV (X1-058A_DK2)

Todhunter 69kV is a 20.0 MW solar interconnection project in Butler, Ohio with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameTodhunter 69kV
Queue IDX1-058A_DK2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity20.0 MW
StateOhio
CountyButler
Point of interconnection—
Requested (queue) date2011-04-05
Proposed in-service date2012-09-01
Operational date—
Withdrawn date2012-02-22
Developer—
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.