Toledo Air National Guard (67967_180FW)

Toledo Air National Guard is a 1.5 MW solar interconnection project in Lucas, Ohio with a current status of operational.

1.5 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameToledo Air National Guard
Queue ID67967_180FW
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity1.5 MW
StateOhio
CountyLucas
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2010-01-01
Withdrawn date—
Developer—
Utility / transmission owner180th Fighter Wing

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata