Tolivar Power Plant Phase 2 (28INR0413)

Tolivar Power Plant Phase 2 is a 224.5 MW gas interconnection project in Reeves, Texas with a current status of operational. It is proposed to connect at Tap 138 KV 38055 Saltdraw-38043 COWPEN .

224.5 MWCapacity
OperationalStatus
ReevesMarket
GasTechnology

Project facts

Canonical nameTolivar Power Plant Phase 2
Queue ID28INR0413
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketReeves
TechnologyGas
Capacity224.5 MW
StateTexas
CountyReeves
Point of interconnectionTap 138 KV 38055 Saltdraw-38043 COWPEN
Requested (queue) date2025-07-29
Proposed in-service date
Operational date2027-07-30
Withdrawn date
DeveloperPecos Power Plant, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata