Tolk 230kV Substation (ERAS-2025-016)

Tolk 230kV Substation is a 232.5 MW gas interconnection project in Earth, Texas with a current status of operational. It is proposed to connect at Tolk 230kV Substation.

232.5 MWCapacity
OperationalStatus
TXMarket
GasTechnology

Project facts

Canonical nameTolk 230kV Substation
Queue IDERAS-2025-016
Statusoperational
Source statusERAS
MarketTX
TechnologyGas
Capacity232.5 MW
StateTexas
CountyEarth
Point of interconnectionTolk 230kV Substation
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2028-10-31
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.