Tolk East 230kV Substation (GEN-2017-219)

Tolk East 230kV Substation is a 600.0 MW solar interconnection project in Lamb, Texas with a current status of withdrawn. It is proposed to connect at Tolk East 230kV Substation.

600.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTolk East 230kV Substation
Queue IDGEN-2017-219
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity600.0 MW
StateTexas
CountyLamb
Point of interconnectionTolk East 230kV Substation
Requested (queue) date2017-11-30
Proposed in-service date
Operational date
Withdrawn date2022-03-10
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.