Tom G Smith (673_MU2)
Tom G Smith is a 2.0 MW other interconnection project in Palm Beach, Florida with a current status of operational.
2.0 MWCapacity
OperationalStatus
FMPPMarket
OtherTechnology
Project facts
| Canonical name | Tom G Smith |
|---|---|
| Queue ID | 673_MU2 |
| Status | operational |
| Source status | (SB) Standby/Backup: available for service but not normally used |
| Market | FMPP |
| Technology | Other |
| Capacity | 2.0 MW |
| State | Florida |
| County | Palm Beach |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 1965-12-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | City of Lake Worth Beach - (FL) |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.