Town Line Solar CSR Phase I (C24-117)

Town Line Solar CSR Phase I is a 240.0 MW solar+battery interconnection project in Sullivan, New York with a current status of withdrawn. It is proposed to connect at Coopers Corner to Middletown Tap 345 kV Line.

240.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameTown Line Solar CSR Phase I
Queue IDC24-117
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity240.0 MW
StateNew York
CountySullivan
Point of interconnectionCoopers Corner to Middletown Tap 345 kV Line
Requested (queue) date2024-08-30
Proposed in-service date
Operational date
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerNYPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata