TOWNSHIP POWER BANK (1864)

TOWNSHIP POWER BANK is a 49.0 MW battery interconnection project in Sutter, California with a current status of active. It is proposed to connect at Greenleaf #1 115 kV Tap.

49.0 MWCapacity
ActiveStatus
NGBAMarket
BatteryTechnology

Project facts

Canonical nameTOWNSHIP POWER BANK
Queue ID1864
Statusactive
Source statusACTIVE
MarketNGBA
TechnologyBattery
Capacity49.0 MW
StateCalifornia
CountySutter
Point of interconnectionGreenleaf #1 115 kV Tap
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.