Townsite Solar Project Hybrid (60654_GEN02)

Townsite Solar Project Hybrid is a 90.0 MW battery interconnection project in Clark, Nevada with a current status of operational.

90.0 MWCapacity
OperationalStatus
WALCMarket
BatteryTechnology

Project facts

Canonical nameTownsite Solar Project Hybrid
Queue ID60654_GEN02
Statusoperational
Source status(OP) Operating
MarketWALC
TechnologyBattery
Capacity90.0 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-12-01
Withdrawn date
Developer
Utility / transmission ownerTownsite Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata