Tracy 69 kV line (J803)

Tracy 69 kV line is a 32.5 MW solar interconnection project in Lyon County, Minnesota with a current status of withdrawn. It is proposed to connect at Tracy 69 kV line.

32.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTracy 69 kV line
Queue IDJ803
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity32.5 MW
StateMinnesota
CountyLyon County
Point of interconnectionTracy 69 kV line
Requested (queue) date2017-06-16
Proposed in-service date2019-10-01
Operational date2019-10-01
Withdrawn date2023-04-25
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata