Tracy BESS (69539_TRAB)

Tracy BESS is a 40.0 MW battery interconnection project in San Joaquin, California with a current status of active.

40.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameTracy BESS
Queue ID69539_TRAB
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketCISO
TechnologyBattery
Capacity40.0 MW
StateCalifornia
CountySan Joaquin
Point of interconnection
Requested (queue) date
Proposed in-service date2027-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMiddle River Power II, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata