Trailblazer BESS (27INR0576)

Trailblazer BESS is a 262.0 MW other interconnection project in Nolan, Texas with a current status of operational. It is proposed to connect at 11420 Sweetwater East Switch 345 kV.

262.0 MWCapacity
OperationalStatus
NolanMarket
OtherTechnology

Project facts

Canonical nameTrailblazer BESS
Queue ID27INR0576
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketNolan
TechnologyOther
Capacity262.0 MW
StateTexas
CountyNolan
Point of interconnection11420 Sweetwater East Switch 345 kV
Requested (queue) date2026-03-18
Proposed in-service date
Operational date2027-12-12
Withdrawn date
DeveloperTrailblazer Infrastructure LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata