Treasure Valley substation - NG Western MA Area Cluster Study (863)

Treasure Valley substation - NG Western MA Area Cluster Study is a 2.2 MW solar interconnection project in Worcester, Massachusetts with a current status of operational. It is proposed to connect at NG Treasure Valley substation.

2.2 MWCapacity
OperationalStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameTreasure Valley substation - NG Western MA Area Cluster Study
Queue ID863
Statusoperational
Source statusC
MarketWMA
TechnologySolar
Capacity2.2 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNG Treasure Valley substation
Requested (queue) date2019-03-21
Proposed in-service date
Operational date2019-09-19
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata