Trelina Solar Energy Center (0720)

Trelina Solar Energy Center is a 79.8 MW solar interconnection project in Seneca, New York with a current status of active. It is proposed to connect at Border City - Station 168 115 KV.

79.8 MWCapacity
ActiveStatus
CMarket
SolarTechnology

Project facts

Canonical nameTrelina Solar Energy Center
Queue ID0720
Statusactive
Source status11
MarketC
TechnologySolar
Capacity79.8 MW
StateNew York
CountySeneca
Point of interconnectionBorder City - Station 168 115 KV
Requested (queue) date2018-06-07
Proposed in-service date
Operational date
Withdrawn date
DeveloperTrelina Solar Energy Center, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata