Trenton (63995_ES1)

Trenton is a 11.0 MW battery interconnection project in Gilchrist, Florida with a current status of operational.

11.0 MWCapacity
OperationalStatus
FPCMarket
BatteryTechnology

Project facts

Canonical nameTrenton
Queue ID63995_ES1
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyBattery
Capacity11.0 MW
StateFlorida
CountyGilchrist
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-12-01
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.