Trenton West Phase 2 (69599_11129)

Trenton West Phase 2 is a 2.0 MW solar interconnection project in Clinton, Illinois with a current status of operational.

2.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameTrenton West Phase 2
Queue ID69599_11129
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity2.0 MW
StateIllinois
CountyClinton
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-11-01
Withdrawn date—
Developer—
Utility / transmission ownerGenerate Capital

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata