Tres Rios Ranch Solar (24INR0404)

Tres Rios Ranch Solar is a 508.0 MW solar interconnection project in Upton, Texas with a current status of operational. It is proposed to connect at 76008 Twelvemile 345kV.

508.0 MWCapacity
OperationalStatus
UptonMarket
SolarTechnology

Project facts

Canonical nameTres Rios Ranch Solar
Queue ID24INR0404
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketUpton
TechnologySolar
Capacity508.0 MW
StateTexas
CountyUpton
Point of interconnection76008 Twelvemile 345kV
Requested (queue) date2022-08-05
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperLectricWind LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata