Tri-State Storage Project (IC-1026)

Tri-State Storage Project is a 260.1 MW solar interconnection project in Decatur County, Georgia with a current status of operational.

260.1 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameTri-State Storage Project
Queue IDIC-1026
Statusoperational
Source status
MarketGA
TechnologySolar
Capacity260.1 MW
StateGeorgia
CountyDecatur County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata