Triangle Ranch Bravo (25INR0178)

Triangle Ranch Bravo is a 200.2 MW other interconnection project in Cottle, Texas with a current status of operational. It is proposed to connect at Edith Clark 345 kV (#60500) .

200.2 MWCapacity
OperationalStatus
CottleMarket
OtherTechnology

Project facts

Canonical nameTriangle Ranch Bravo
Queue ID25INR0178
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCottle
TechnologyOther
Capacity200.2 MW
StateTexas
CountyCottle
Point of interconnectionEdith Clark 345 kV (#60500)
Requested (queue) date2022-10-06
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperTriangle Ranch Wind
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata