Trigo Sol Solar CSG (70585_TRIGO)

Trigo Sol Solar CSG is a 4.6 MW solar interconnection project in Valencia, New Mexico with a current status of active.

4.6 MWCapacity
ActiveStatus
PNMMarket
SolarTechnology

Project facts

Canonical nameTrigo Sol Solar CSG
Queue ID70585_TRIGO
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPNM
TechnologySolar
Capacity4.6 MW
StateNew Mexico
CountyValencia
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTrigo Sol Solar

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.