Trinidad (CO) (511_3)

Trinidad (CO) is a 1.9 MW gas interconnection project in Las Animas, Colorado with a current status of operational.

1.9 MWCapacity
OperationalStatus
WACMMarket
GasTechnology

Project facts

Canonical nameTrinidad (CO)
Queue ID511_3
Statusoperational
Source status(SB) Standby/Backup: available for service but not normally used
MarketWACM
TechnologyGas
Capacity1.9 MW
StateColorado
CountyLas Animas
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1966-05-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Trinidad - (CO)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata