Trinidad Solar (70118_GEN1)

Trinidad Solar is a 1.8 MW solar interconnection project in Las Animas, Colorado with a current status of active.

1.8 MWCapacity
ActiveStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameTrinidad Solar
Queue ID70118_GEN1
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketWACM
TechnologySolar
Capacity1.8 MW
StateColorado
CountyLas Animas
Point of interconnection
Requested (queue) date
Proposed in-service date2027-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerClay Creek Energy, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.