Trinity Hills BESS SLF (26INR0295)

Trinity Hills BESS SLF is a 94.0 MW other interconnection project in Archer, Texas with a current status of operational. It is proposed to connect at To the 345 kV Garvey Road Switch (#17002).

94.0 MWCapacity
OperationalStatus
ArcherMarket
OtherTechnology

Project facts

Canonical nameTrinity Hills BESS SLF
Queue ID26INR0295
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketArcher
TechnologyOther
Capacity94.0 MW
StateTexas
CountyArcher
Point of interconnectionTo the 345 kV Garvey Road Switch (#17002)
Requested (queue) date2023-11-30
Proposed in-service date
Operational date2028-01-24
Withdrawn date
DeveloperPhoenix Battery Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata