Trinity Hills is a 225.0 MW wind interconnection project with a current status of operational. It is proposed to connect at TRI_TH1_BUS134.500.

225.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameTrinity Hills
Queue ID08INR0062
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity225.0 MW
State
County
Point of interconnectionTRI_TH1_BUS134.500
Requested (queue) date2007-06-25
Proposed in-service date2011-12-01
Operational date
Withdrawn date
DeveloperBP Wind Energy North America, Inc
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata