Troup RC50 (62885_TROUP)

Troup RC50 is a 2.3 MW solar interconnection project in Harris, Georgia with a current status of operational.

2.3 MWCapacity
OperationalStatus
SOCOMarket
SolarTechnology

Project facts

Canonical nameTroup RC50
Queue ID62885_TROUP
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologySolar
Capacity2.3 MW
StateGeorgia
CountyHarris
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-04-01
Withdrawn date—
Developer—
Utility / transmission ownerWestbound Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata