Trumpet Solar (29INR0360)
Trumpet Solar is a 533.0 MW solar interconnection project in Reeves, Texas with a current status of operational. It is proposed to connect at tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3.
533.0 MWCapacity
OperationalStatus
ReevesMarket
SolarTechnology
Project facts
| Canonical name | Trumpet Solar |
|---|---|
| Queue ID | 29INR0360 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Reeves |
| Technology | Solar |
| Capacity | 533.0 MW |
| State | Texas |
| County | Reeves |
| Point of interconnection | tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3 |
| Requested (queue) date | 2026-06-17 |
| Proposed in-service date | — |
| Operational date | 2029-07-01 |
| Withdrawn date | — |
| Developer | Nextera |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | phase | SS Started, FIS Started, No IA | SS Completed, FIS Started, No IA | low |
| 2026-10-30 | operational_date | — | 2029-07-01 | medium |
| 2026-10-30 | proposed_online_date | 2029-07-01 | — | medium |
| 2026-10-30 | capacity_mw | 455.0 | 533 | high |
| 2026-10-30 | status | active | operational | high |
| 2026-09-30 | poi_name | tap Drylake_8 (#18732) --- TNFaulkner1(#38124) | tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3 | low |
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata