Tu199B (Q26-LG-3-20)

Tu199B is a 199.0 MW battery interconnection project in El Paso County, Texas with a current status of active. It is proposed to connect at Tuskegee 345 kV Substation.

199.0 MWCapacity
ActiveStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameTu199B
Queue IDQ26-LG-3-20
Statusactive
Source status
MarketTX
TechnologyBattery
Capacity199.0 MW
StateTexas
CountyEl Paso County
Point of interconnectionTuskegee 345 kV Substation
Requested (queue) date2026-03-20
Proposed in-service date2029-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata