TUCO 230kV (GEN-2012-020)

TUCO 230kV is a 478.0 MW wind interconnection project in Abernathy County, Texas with a current status of operational. It is proposed to connect at TUCO 230kV.

478.0 MWCapacity
OperationalStatus
TXMarket
WindTechnology

Project facts

Canonical nameTUCO 230kV
Queue IDGEN-2012-020
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketTX
TechnologyWind
Capacity478.0 MW
StateTexas
CountyAbernathy County
Point of interconnectionTUCO 230kV
Requested (queue) date2012-09-26
Proposed in-service date
Operational date2015-09-30
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata