TUCO 345kV (GEN-2010-033)

TUCO 345kV is a 230.0 MW wind interconnection project in Hale County, Texas with a current status of withdrawn. It is proposed to connect at TUCO 345kV.

230.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameTUCO 345kV
Queue IDGEN-2010-033
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity230.0 MW
StateTexas
CountyHale County
Point of interconnectionTUCO 345kV
Requested (queue) date2010-06-25
Proposed in-service date
Operational date
Withdrawn date2010-10-25
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata