Tuco to Yoakum 345kV line (GEN-2020-068)

Tuco to Yoakum 345kV line is a 400.0 MW solar interconnection project in Terry & Hockley, Texas with a current status of withdrawn. It is proposed to connect at Tuco to Yoakum 345kV line.

400.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTuco to Yoakum 345kV line
Queue IDGEN-2020-068
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity400.0 MW
StateTexas
CountyTerry & Hockley
Point of interconnectionTuco to Yoakum 345kV line
Requested (queue) date2020-04-29
Proposed in-service date2026-12-01
Operational date
Withdrawn date2025-10-03
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata