Tuco-Yoakum 345kV Line (ERAS-2025-028)

Tuco-Yoakum 345kV Line is a 384.0 MW solar interconnection project in Levelland, Texas with a current status of operational. It is proposed to connect at Tuco-Yoakum 345kV Line.

384.0 MWCapacity
OperationalStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTuco-Yoakum 345kV Line
Queue IDERAS-2025-028
Statusoperational
Source statusERAS
MarketTX
TechnologySolar
Capacity384.0 MW
StateTexas
CountyLevelland
Point of interconnectionTuco-Yoakum 345kV Line
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2029-11-18
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata