Tuco-Yoakum-Hobbs 345 kV (GEN-2020-059)

Tuco-Yoakum-Hobbs 345 kV is a 250.0 MW solar interconnection project in Lovington, New Mexico with a current status of withdrawn. It is proposed to connect at Tuco-Yoakum-Hobbs 345 kV.

250.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameTuco-Yoakum-Hobbs 345 kV
Queue IDGEN-2020-059
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity250.0 MW
StateNew Mexico
CountyLovington
Point of interconnectionTuco-Yoakum-Hobbs 345 kV
Requested (queue) date2020-04-29
Proposed in-service date2027-06-01
Operational date
Withdrawn date2025-03-27
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.