Turk - Hope 115 kV line (GEN-2022-093)

Turk - Hope 115 kV line is a 83.0 MW solar interconnection project in Hempstead, Arkansas with a current status of withdrawn. It is proposed to connect at Turk - Hope 115 kV line.

83.0 MWCapacity
WithdrawnStatus
ARMarket
SolarTechnology

Project facts

Canonical nameTurk - Hope 115 kV line
Queue IDGEN-2022-093
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologySolar
Capacity83.0 MW
StateArkansas
CountyHempstead
Point of interconnectionTurk - Hope 115 kV line
Requested (queue) date2022-11-15
Proposed in-service date2027-04-01
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.