Turkey Creek Solar Project (64744_TC001)

Turkey Creek Solar Project is a 200.0 MW solar interconnection project in Pueblo, Colorado with a current status of active.

200.0 MWCapacity
ActiveStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameTurkey Creek Solar Project
Queue ID64744_TC001
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketWACM
TechnologySolar
Capacity200.0 MW
StateColorado
CountyPueblo
Point of interconnection
Requested (queue) date
Proposed in-service date2027-02-01
Operational date
Withdrawn date
Developer
Utility / transmission owner174 Power Global Corp.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata